An agreement permitting an operator access to carry out a survey can be imposed on an occupier under the Electronic Communications Code 2017.
An agreement permitting an operator access to carry out a survey can be imposed on an occupier under the Electronic Communications Code 2017.
The respondent telecommunications operator (C) wanted to access the roof of a hall of residence owned by the appellant (UoL) to carry out a survey and other non-intrusive investigations (known as a “multi-skilled visit”) to establish if the building was suitable to install electronic communication apparatus on its roof. C served a notice on UoL under paragraph 26 of the Electronic Communications Code 2017 (the Code) seeking the grant of interim code rights to access the building for the purposes of a multi-skilled visit. UoL initially objected to the grant of the right on the basis that the definition of “code right” in paragraph 3 of the Code did not expressly cover access for the purposes sought by C.
Was the definition of “code right” in paragraph 3 of the Code sufficiently wide to include a right of access to undertake a survey to assess the suitability of a building for the installation of electronic communications apparatus?
The right sought by C was covered by paragraph 3(d) of the Code. This included as a code right the right:
“to carry out any works on the land for or in connection with the installation of electronic communications apparatus on, under or over the land…”.
The use of the phrase “for or in connection with” meant that it was enough that the works were in connection with a possible installation. The operations necessary to carry out a multi-skilled visit therefore amounted to “works” for the purpose of the Code, even if they were non-intrusive. It would make no difference if the multi-skilled visit ultimately concluded that the site was not suitable.